Inspection Service

Introductions of Laboratory Inspection (CTWWA)

Lab Introductions (1)、This tools and materials are subordinate to this meeting (conference) established on the first at the New Year of 2002, serve to the group, and inspect the section of the business inspecting it to verify the quality system for the laboratory, suitable for the attestation of the quality of ISO/IEC17025, and to be engaged in the specialty (Try).
(2)、System (CNLA) is attested through the Republic of China laboratory (Pass) on May 1,'92, it comments, the mirror is rated, and the authorization project: Examination of test (3) metal organization of the (2) hardness that enlarges the (1) examination.
(3)、It is possible to project by attesting fund association (TAF) through a corporate whole country (Pass) of the foundation on May 10,'95 and postponing to the evaluation, and the authorization project: The oxidizing (6) salt water soaks the examination in the examination of the load of the bolt of examination (5) of examination (4) film of test (3) metal organization of the (2) hardness that enlarges the (1) examination. The serial number is authorized: 1073 authorization project: 1. The examination of the matter hardness of the cast iron of globular graphite of the alloy kind of (0101 M001) metal and material and product.
2.(0101 M002)The examination of the matter of the cast iron of globular graphite of the
alloy kind of metal and material and product is enlarged.
3.(0101 M008)Graphite in a graphitized cast iron is an examination of a metallic organization of the radical of the iron of distribution. form material
4.(0101 M009)It ..examination of Kemmac of the cast iron of globular graphite of the
metal and the alloy kind of material and product.. oxidizes.
5.(0103 M014)The load of a safe bolt of the alloy kind of metal and material and
product is examined.
6.(0103 M033)The metal, the kind of material of the alloy, and the bolt salt
water of the product soak the examination.
Inspector Originally would all inspectors all have already obtained "the certification system(CNLA) of R.O.C. laboratory" ISO/IEC 17025"the laboratory quality's management train" and"test laboratory the representative director train"s to test a qualified certificate. Accepts a member and relevant organization to entrust already.(material experiment, device examination)
Inspection Items The ductility casts iron tube(DIP) and tube piece. Valve.(the hydrant, Die valve, flexible, system water valve and row annoy valve) Steel pipe(SP) and the steel pipe another piece. The steel Chen prepares a power concrete tube(PCCP) and prepare power concrete a tube(PSCP). The plastics takes care of(PVCP). Running water form.
Contact Office Address: 7F., No.106, Sec. 2, Chang-an E. Rd., Songshan District, Taipei City 105, Taiwan ( R.O.C.)
Phone: 886-2-2507-3832 Faxes: 886-2-2504-2350
Association Office Service Department : Miss Lee
Lab Phone:886-6-302-4691 Lab Fax:886-6-301-3221
e-mail address:ctwwa.mtla@msa.hinet.net
Laboratory representative director: Mr. Lo Chin Yang